Automatic Doypack Filling Machines for Coffee Powder Sugar Tea Nuts Snack Food Granule Pouch Packing Line

Product Description

Packing Machine 1
Packing Machine 2
Packing Machine 3
Packing Machine 4
Main packing machine technical parameters
Model D-150D D-200D D-250D D-320D
Bag width (mm) 80-150 90-200 150-250 200-320
Bag length (mm) 100-210 110-330 150-400 150-500
Packing speed 20-60bags/min 20-60bags/min 10-60bags/min 10-50bags/min
Power supply 220V/380V 220V/380V 220V/380V 220V/380V
Machine power 2.5kw 50Hz 3.5kw 50Hz 3.5kw 50Hz 2.5kw 50Hz
Gas consumption 0.35m³ 0.5m³ 0.7m³ 0.7m³
Machine size (mm) 1700*1050*1100 2150*1350*1300 2450*1200*1200 2800*1200*1200
Machine weight 600KG 900KG 1100KG 1500KG
Application type bag 3-sided bag , 4-sided bag , pillow bag , standing bag , M bags , special bag
Machine Detail 1
Machine Detail 2
Payment
  • T/T and Western Union are accepted.
  • 30% deposit before production and 70% balance before shipment.
  • All banking charges outside China are on buyers.
Shipping
  • Upon receipt of payment, delivery date will be in 15-30 working days.
  • Available by Air, Sea or Express (DHL etc).
  • Shipment cost depends on destination, method and weight.
Frequently Asked Questions
Q1: Do you have manual or operation video for the machine?
Yes, we provide manuals, operation videos, and 3D drawings. We can also create a testing video using your specific material if it's available in our local market.
Q2: How can I trust you for the first time business?
You can verify our business license and certificates. Furthermore, we support trade assurance services to guarantee your money, machine quality, and on-time delivery.
Q3: Is an engineer available to serve overseas?
Yes, engineers are available, though travel fees are covered by the buyer. To save costs, we provide detailed installation videos and full technical support throughout the process.
Q4: How can we ensure the machine quality after placing an order?
Before delivery, we will send pictures and videos for your inspection. You can also arrange for a quality check personally or through a third-party contact in China.
Q5: Do you provide door-to-door service?
Yes. Please provide your final destination, and we will check with our agent. Most areas are eligible for our customs clearing and delivery services.
Q6: What is the typical production lead time?
Standard delivery takes approximately 15-30 working days once the initial payment is received, depending on the machine model and customization requirements.

Related Products